cultural_awareness_level_10
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| cultural_awareness_level_10 [2018/07/24 19:46] – Admin | cultural_awareness_level_10 [2024/12/03 16:58] (current) – [Resources for All of Cultural Awareness Level 10] admin_lpsd | ||
|---|---|---|---|
| Line 6: | Line 6: | ||
| CA10.01 Student completes ONE capstone project encompassing all pillars, or looking at one pillar in depth. The project must be approved by the student’s head teacher or principal, a community mentor (of the student’s choice), and the Curriculum Director before the student begins his/her work. | CA10.01 Student completes ONE capstone project encompassing all pillars, or looking at one pillar in depth. The project must be approved by the student’s head teacher or principal, a community mentor (of the student’s choice), and the Curriculum Director before the student begins his/her work. | ||
| + | [[https:// | ||
| ===== Resources for All of Cultural Awareness Level 10 ===== | ===== Resources for All of Cultural Awareness Level 10 ===== | ||
| + | |||
| + | [[https:// | ||
| [[cultural_awareness|Back to Cultural Awareness]] | [[cultural_awareness|Back to Cultural Awareness]] | ||
cultural_awareness_level_10.1532461612.txt.gz · Last modified: (external edit)
